Roofs of the Chute-du-Diable and Chute-à-la-Savane power plants
Renovation of concrete roofs and renovation of concrete walls of the 250T gantry crane rails
2022-2023
- Client :
- Rio Tinto
- Lieux :
- L'Ascension (CCD) and Ste-Monique (CCS)
Work executed
- Concrete demolition work
- Installation of reinforcement and anchors
- Formwork and concreting work
- Installation of gantry crane rails
- Installation of epoxy grout
- Crack injection
- Crack sealing work
- Application of liquid bituminous membrane
- Concrete slab sealing work
Constraints
- Existing, aging facilities causing unforeseen events
- Single access to the roof with a crane for materials and equipment (CCD)
- Significant co-activity with the operation and third parties
- Safety (site in operation)
- Several technical products to be applied
- High standard quality control
- Environmental management (Péribonka River)